Last Updated: 11-20-2024
The Gaston Rural Community Water District will receive Sealed Bids for the RIA Water Line Replacement Project until 2:00 p.m. on December 20, 2024 at the Gaston Rural Community Water District offices at 1133 Mack Street, Gaston, SC 29053, at which time and place all Bids will be publicly opened and read aloud.
Base Bid: Construction of approximately 1,995 linear feet of 8-inch waterline, 20 linear feet of 6-inch waterline, bore and jack 20-inch steel casing with carrier pipe, connections to existing water mains, installation of new service lines to existing water meters, abandonment of existing water lines and valves, installation of gate valves and fire hydrant assemblies, restrained joint fittings, removal and replacement of asphalt roadway and asphalt driveways, and all other necessary appurtenances as specified and depicted in the Contract Documents for fire flow protection and to serve the existing residences along HWY 321.
Additive Alternate 1: Construction of approximately 285 linear feet of 8-inch waterline, abandonment of existing water lines and valves, restrained joint fittings, and all other necessary appurtenances as specified and depicted in the Contract Documents for fire flow protection and to serve the existing residences along HWY 321.
Additive Alternate 2: Construction of approximately 210 linear feet of 8-inch waterline, installation of new service lines to existing water meters, abandonment of existing water lines and valves, restrained joint fittings, removal and replacement of asphalt roadway and asphalt driveways, and all other necessary appurtenances as specified and depicted in the Contract Documents for fire flow protection and to serve the existing residences along HWY 321.